Size: 4,242 SF Renovations | 1,550 SF Addition
Collaboration Partner: Mark Young Construction (MYC)
This single-story fire station built in 1999 comprised of approximately 8,200 SF and at the time was the only fire station for the Tri-Lakes Monument Fire Protection District. The station was built to accommodate a few office staff and two to five firefighters. As initially constructed, the living space included a board room, 5 offices, a kitchen, lounge area, bunkroom, utility room, 2 separate male/female bath/shower combinations, a half bath, and a few storage spaces.
Station 1 houses two shifts with provisions to go to three of six career firefighters. The offices have been converted to bunkrooms, the bunkroom to a weight room, and the board room to a training room, amongst a major renovation to update finishes, improve response time from bunk to truck (engine), and future growth accommodations. The addition includes a community/training room, restroom, offices, and bunker gear room.
303.952.4802
1212 S. Broadway Suite 250, Denver, CO 80210
copyright 2020, d2c architects.